Eisenhower Productivity Box for Product Managers

120px-Dwight_D._Eisenhower,_White_House_photo_portrait,_February_1959

President Dwight Eisenhower was the 34th President of the United States. It is said that Eisenhower had an incredible ability to sustain his productivity almost throughout his illustrious career and life. He is famous for his productivity strategy, now known as Eisenhower box. This is a simple 2 x 2 matrix combining importance and urgency. I have tried creating one for Product Managers based on my experience.

Screen Shot 2016-05-11 at 17.48.38

 

 

 

 

 

 

 

 

Let us start with the second quadrant; the tasks which are important but not urgent. They are usually strategic and long-term in nature. You must schedule and plan them. One way to make sure that you do concentrate on second quadrant tasks is to schedule the tasks much in advance on a calendar accessible by all the stakeholders so that you have a deadline for yourself and you will pay attention to these tasks.

The first quadrant items are the ones which eat-up your time. You cannot avoid them, but if you have spent enough time on the tasks in the second quadrant, then the ones in the first quadrant will at least not be a surprise. For example, if you prepare collaterals for stake-holders much in advance, then you can avoid surprises during the time of product release.

The one in the third quadrant is something that is mundane, can be automated or delegated. These have to be done, so that it helps you to accelerate the tasks in first two quadrants, but avoid doing the tasks here yourself. For example, if you need to conduct user testing, gathering participants must be delegated after you review the guideline for gathering participants.

Finally, the fourth quadrant. Things you must stop doing. Depending on your seniority, the content of this quadrant changes.

What is your opinion about this?